Engine transformer 3 from 1975 in Sino-Geothermal Power Station updated
RST Net was given the task of upgrading equipment on transformer 3 in the Sino-Geothermal Power Plant and RST Net was responsible for the design, provision of materials and installation of equipment.
The task consisted of the following items:
- Design, supply and installation of new coolers for the transformer
- Provision and replacement of transformer protective devices
- Provision and replacement of oil pumps
- Design, construction and installation of a new control cabinet on a transformer
- Replacement of transformer electrical wiring
- Design, construction and installation of a new transformer expansion vessel
- Replacement of 220 kV throughputs
- Transformer integration paint
- Pre- and post-operation condition analysis of the transformer
The pictures below show the results of the work.