After

Upgrade of transformer 3 in Sino-Geothermal Power Station

Engine transformer 3 from 1975 in Sino-Geothermal Power Station updated

RST Net was given the task of upgrading equipment on transformer 3 in the Sino-Geothermal Power Plant and RST Net was responsible for the design, provision of materials and installation of equipment. 

The task consisted of the following items:

  • Design, supply and installation of new coolers for the transformer
  • Provision and replacement of transformer protective devices
  • Provision and replacement of oil pumps
  • Design, construction and installation of a new control cabinet on a transformer
  • Replacement of transformer electrical wiring
  • Design, construction and installation of a new transformer expansion vessel
  • Replacement of 220 kV throughputs
  • Transformer integration paint
  • Pre- and post-operation condition analysis of the transformer